{"id":451639,"date":"2018-10-18T17:28:54","date_gmt":"2018-10-18T17:28:54","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=22175"},"modified":"2018-10-18T17:28:54","modified_gmt":"2018-10-18T17:28:54","slug":"rhode-islands-southern-sky-renewable-energy-commissions-2-6-mw-landfill-solar-array","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/rhode-islands-southern-sky-renewable-energy-commissions-2-6-mw-landfill-solar-array\/","title":{"rendered":"Rhode Island\u2019s Southern Sky Renewable Energy commissions 2.6-MW landfill solar array"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Southern Sky Renewable Energy RI was joined by Rhode Island state Governor Gina Raimondo, North Providence Mayor Charles Lombardi, Senate President Dominick Ruggerio, business leaders and elected officials to mark the completion of a 2.6 MW solar array on Smithfield Road. The former municipal landfill site is now producing clean<a href=\"https:\/\/solarbuildermag.com\/news\/rhode-islands-southern-sky-renewable-energy-commissions-2-6-mw-landfill-solar-array\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9974,14979],"class_list":["post-451639","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-projects","tag-southern-sky-renewable-energy"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/451639","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=451639"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/451639\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=451639"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=451639"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=451639"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}