{"id":455316,"date":"2018-10-29T16:54:56","date_gmt":"2018-10-29T16:54:56","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=22270"},"modified":"2018-10-29T16:54:56","modified_gmt":"2018-10-29T16:54:56","slug":"largest-solar-power-plant-in-the-southeastern-u-s-sold-to-origis-energy","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/largest-solar-power-plant-in-the-southeastern-u-s-sold-to-origis-energy\/","title":{"rendered":"Largest solar power plant in the southeastern U.S. sold to Origis Energy"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Origis Energy acquired the GA Solar 4 Project from First Solar, a 200 MWac solar asset located in Twiggs County, Ga. This is expected to be the largest solar power plant in the southeastern United States when completed. Terms of the deal were not disclosed. Origis will sell all energy<a href=\"https:\/\/solarbuildermag.com\/news\/largest-solar-power-plant-in-the-southeastern-u-s-sold-to-origis-energy\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,13996,9974],"class_list":["post-455316","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-origis-energy","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/455316","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=455316"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/455316\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=455316"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=455316"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=455316"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}