{"id":46522,"date":"2014-10-07T08:00:35","date_gmt":"2014-10-07T08:00:35","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=8154"},"modified":"2014-10-07T08:00:35","modified_gmt":"2014-10-07T08:00:35","slug":"borrego-solar-completes-2-4-mw-roof-mount-system-at-anaheim-convention-center","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/borrego-solar-completes-2-4-mw-roof-mount-system-at-anaheim-convention-center\/","title":{"rendered":"Borrego Solar Completes 2.4-MW Roof-Mount System at Anaheim Convention Center"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Today the City of Anaheim held a dedication ceremony celebrating the recently completed 2.4-megawatt (MW) solar panel system on the Anaheim Convention Center. The $5.7 million project managed by Anaheim Public Utilities was completed mid-August by Borrego Solar Systems Inc., a leading designer, developer, installer and financier of grid tied<a href=\"http:\/\/solarbuildermag.com\/news\/borrego-solar-completes-2-4-mw-roof-mount-system-anaheim-convention-center\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9667,12497],"class_list":["post-46522","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-pacific","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/46522","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=46522"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/46522\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=46522"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=46522"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=46522"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}