{"id":469329,"date":"2018-12-07T13:00:59","date_gmt":"2018-12-07T13:00:59","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=22587"},"modified":"2018-12-07T13:00:59","modified_gmt":"2018-12-07T13:00:59","slug":"solar-storage-inverter-selection-inverter-stacking-vs-high-voltage-inverters","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solar-storage-inverter-selection-inverter-stacking-vs-high-voltage-inverters\/","title":{"rendered":"Solar + storage inverter selection: inverter stacking vs. high voltage inverters"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Scaling an energy storage system requires stacking both energy (batteries) and power (inverters). Batteries that were designed to be modular can typically be stacked without limitation. However, inverter stacking presents more challenges. The question installers must answer is at what point does it make sense to jump from a multi-inverter<a href=\"https:\/\/solarbuildermag.com\/inverters\/solar-storage-inverter-selection-inverter-stacking-vs-high-voltage-inverters\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15032,442,12491,13631],"class_list":["post-469329","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-12-days-of-storage","tag-energy-storage","tag-inverters","tag-simpliphi-power"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/469329","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=469329"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/469329\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=469329"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=469329"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=469329"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}