{"id":469344,"date":"2018-12-07T13:15:47","date_gmt":"2018-12-07T13:15:47","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=22731"},"modified":"2018-12-07T13:15:47","modified_gmt":"2018-12-07T13:15:47","slug":"eighty-percent-of-the-largest-solar-project-in-california-is-now-in-operation","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/eighty-percent-of-the-largest-solar-project-in-california-is-now-in-operation\/","title":{"rendered":"Eighty percent of the largest solar project in California is now in operation"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Developer 8minutenergy Renewables and private asset management firm Capital Dynamics kicked off commercial operation of the 328 MWdc Mount Signal 3 Solar Farm. The project is the largest in the 800 MW Mount Signal solar cluster, which is not only the largest PV project in California, but also among the<a href=\"https:\/\/solarbuildermag.com\/news\/eighty-percent-of-the-largest-solar-project-in-california-is-now-in-operation\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14184,15036,2906,9974],"class_list":["post-469344","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-8minutenergy-renewables","tag-mortensen-construction","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/469344","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=469344"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/469344\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=469344"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=469344"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=469344"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}