{"id":469840,"date":"2018-12-10T14:25:18","date_gmt":"2018-12-10T14:25:18","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=22739"},"modified":"2018-12-10T14:25:18","modified_gmt":"2018-12-10T14:25:18","slug":"duke-energy-received-four-times-its-bid-target-for-its-carolinas-rfp-2","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/duke-energy-received-four-times-its-bid-target-for-its-carolinas-rfp-2\/","title":{"rendered":"Duke Energy received four times its bid target for its Carolinas RFP"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Duke Energy opened up the the Competitive Procurement for Renewable Energy (CPRE) as part of the Competitive Energy Solutions Law for North Carolina, back in July and was overwhelmed with bids. In the first tranche, Duke Energy is seeking 680 megawatts (MW) of solar capacity for the Carolinas, comprised of<a href=\"https:\/\/solarbuildermag.com\/news\/duke-energy-received-four-times-the-number-of-bids-it-targeted-in-its-carolinas-rfp\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2049,1590,2906],"class_list":["post-469840","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-duke-energy","tag-financing","tag-news"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/469840","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=469840"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/469840\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=469840"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=469840"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=469840"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}