{"id":470093,"date":"2018-12-11T19:15:54","date_gmt":"2018-12-11T19:15:54","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=22776"},"modified":"2018-12-11T19:15:54","modified_gmt":"2018-12-11T19:15:54","slug":"solaredge-products-ready-to-meet-both-nec-2017-and-rule-21-phase-3","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solaredge-products-ready-to-meet-both-nec-2017-and-rule-21-phase-3\/","title":{"rendered":"SolarEdge products ready to meet both NEC 2017 and Rule 21 Phase 3"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>&nbsp; SolarEdge Technologies is ready for the implementation of both NEC 2017&rsquo;s revision to the PV Rapid Shutdown System (PVRSS) requirements for 2019 and is prepared for the roll out of Phase 3 of Rule 21. The company offers solutions that comply with these regulations. &ldquo;By preparing our product lineup<a href=\"https:\/\/solarbuildermag.com\/bos\/solaredge-products-ready-to-meet-both-nec-2017-and-rule-21-phase-3\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12495,12491,14418,2906,3000,14044,13109],"class_list":["post-470093","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-bos","tag-inverters","tag-nec-2017","tag-news","tag-products","tag-rule-21","tag-solaredge"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/470093","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=470093"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/470093\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=470093"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=470093"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=470093"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}