{"id":470131,"date":"2018-12-11T22:07:04","date_gmt":"2018-12-11T22:07:04","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=22785"},"modified":"2018-12-11T22:07:04","modified_gmt":"2018-12-11T22:07:04","slug":"sepisolar-says-californias-nem-policy-revision-paves-the-way-for-larger-solar-systems-quicker-interconnection","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sepisolar-says-californias-nem-policy-revision-paves-the-way-for-larger-solar-systems-quicker-interconnection\/","title":{"rendered":"SepiSolar says California\u2019s NEM policy revision paves the way for larger solar systems, quicker interconnection"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>A new SepiSolar white paper reveals the financial benefits of a pending revision to California&rsquo;s net energy metering (NEM) policy. When finalized, commercial DC-coupled solar-plus-storage installations will not only be able to benefit from NEM, but will also be able to increase solar system size, reduce installation and permitting costs,<a href=\"https:\/\/solarbuildermag.com\/news\/sepisolar-says-californias-nem-policy-revision-paves-the-way-for-larger-solar-systems-quicker-interconnection\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[69,57,9666],"tags":[442,2397,2906,15043],"class_list":["post-470131","post","type-post","status-publish","format-standard","hentry","category-california-leed-projects","category-leed-news","category-solar-power-energy","tag-energy-storage","tag-net-metering","tag-news","tag-sepisolar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/470131","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=470131"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/470131\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=470131"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=470131"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=470131"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}