{"id":471785,"date":"2018-12-20T15:19:38","date_gmt":"2018-12-20T15:19:38","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=22897"},"modified":"2018-12-20T15:19:38","modified_gmt":"2018-12-20T15:19:38","slug":"massachusetts-smart-program-kicks-off-with-this-9-8-mw-solar-storage-portfolio","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/massachusetts-smart-program-kicks-off-with-this-9-8-mw-solar-storage-portfolio\/","title":{"rendered":"Massachusetts SMART program kicks off with this 9.8-MW solar + storage portfolio"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>SunRaise Investments, LLC and Borrego Solar Systems Inc. announced the completion of two of the first solar projects under the new Solar Massachusetts Renewable Target (SMART) program. The larger of the two projects is a 7.1 megawatt (MW) array located on a gravel pit in Winchendon, Mass. The project is<a href=\"https:\/\/solarbuildermag.com\/projects\/massachusetts-smart-program-kicks-off-with-this-9-8-mw-solar-storage-portfolio\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12984,811,2906,9974,14740],"class_list":["post-471785","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-borrego-solar","tag-community-solar","tag-news","tag-projects","tag-sunraise-investments"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/471785","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=471785"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/471785\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=471785"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=471785"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=471785"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}