{"id":474445,"date":"2019-01-02T15:14:34","date_gmt":"2019-01-02T15:14:34","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=22929"},"modified":"2019-01-02T15:14:34","modified_gmt":"2019-01-02T15:14:34","slug":"harvest-energy-solutions-installs-first-utility-solar-project-in-michigans-lenawee-county","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/harvest-energy-solutions-installs-first-utility-solar-project-in-michigans-lenawee-county\/","title":{"rendered":"Harvest Energy Solutions installs first utility solar project in Michigan\u2019s Lenawee County"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Jackson, Mich.-based solar energy provider, Harvest Energy Solutions is the first provider of solar energy to a utility in Lenawee County, Mich., via three large scale solar array projects in the region. The installations are owned by Stateline Farms, Gerken Paving, and Harvest Solar Lenawee. Each of these systems is<a href=\"https:\/\/solarbuildermag.com\/news\/harvest-energy-solutions-installs-first-utility-solar-project-in-michigans-lenawee-county\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15049,2906,9974,13172],"class_list":["post-474445","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-harvest-energy-solutions","tag-news","tag-projects","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/474445","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=474445"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/474445\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=474445"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=474445"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=474445"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}