{"id":475559,"date":"2019-01-08T18:18:24","date_gmt":"2019-01-08T18:18:24","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=22966"},"modified":"2019-01-08T18:18:24","modified_gmt":"2019-01-08T18:18:24","slug":"duke-energy-florida-brings-massive-hamilton-solar-power-plant-online","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/duke-energy-florida-brings-massive-hamilton-solar-power-plant-online\/","title":{"rendered":"Duke Energy Florida brings massive Hamilton Solar Power Plant online"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The new 74.9-megawatt (MW) Hamilton Solar Power Plant in Jasper, Fla., is now operation, according to Duke Energy. The plant&rsquo;s carbon-free power is enough to energize more than 20,000 homes at peak production. The Hamilton plant is part of the company&rsquo;s strategic commitment to install or acquire 700 MW of<a href=\"https:\/\/solarbuildermag.com\/projects\/duke-energy-florida-brings-massive-hamilton-solar-power-plant-online\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[9974,13172],"class_list":["post-475559","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-projects","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/475559","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=475559"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/475559\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=475559"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=475559"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=475559"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}