{"id":480329,"date":"2019-01-30T14:00:08","date_gmt":"2019-01-30T14:00:08","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=23226"},"modified":"2019-01-30T14:00:08","modified_gmt":"2019-01-30T14:00:08","slug":"edf-renewables-morris-ridge-solar-project-receives-long-term-contract-from-nyserda","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/edf-renewables-morris-ridge-solar-project-receives-long-term-contract-from-nyserda\/","title":{"rendered":"EDF Renewables\u2019 Morris Ridge Solar Project receives long-term contract from NYSERDA"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The New York State Energy Research and Development Authority (NYSERDA) awarded a long-term contract to the&nbsp;212 megawatt (MWdc) \/ 170 MWac Morris Ridge Solar Project as part of the 2018 Renewable Energy Standard Solicitation. The project, sited on approximately 1,000 acres in the Town of Mount Morris, south of the<a href=\"https:\/\/solarbuildermag.com\/news\/edf-renewables-morris-ridge-solar-project-receives-long-term-contract-from-nyserda\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14986,1590,2906,9974],"class_list":["post-480329","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-edf-renewables","tag-financing","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/480329","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=480329"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/480329\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=480329"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=480329"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=480329"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}