{"id":482690,"date":"2019-02-11T15:11:31","date_gmt":"2019-02-11T15:11:31","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=23312"},"modified":"2019-02-11T15:11:31","modified_gmt":"2019-02-11T15:11:31","slug":"7x-energy-sells-late-stage-100-mw-solar-project-in-texas-to-duke-energy","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/7x-energy-sells-late-stage-100-mw-solar-project-in-texas-to-duke-energy\/","title":{"rendered":"7X Energy sells late-stage 100-MW solar project in Texas to Duke Energy"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>7X Energy, a leader in solar development in the U.S., announced the sale of the 100-megawatt (MW) Lapetus Solar Energy Project in Andrews County, Texas, to Duke Energy Renewables.&nbsp;7X, the original owner and developer, will transition the last stages of development of the solar project to Duke Energy, which also<a href=\"https:\/\/solarbuildermag.com\/financing\/7x-energy-sells-late-stage-100-mw-solar-project-in-texas-to-duke-energy\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[1590,2906,9974],"class_list":["post-482690","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-financing","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/482690","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=482690"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/482690\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=482690"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=482690"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=482690"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}