{"id":485496,"date":"2019-02-25T13:15:19","date_gmt":"2019-02-25T13:15:19","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=23446"},"modified":"2019-02-25T13:15:19","modified_gmt":"2019-02-25T13:15:19","slug":"the-largest-bifacial-solar-module-tracker-project-in-the-u-s-to-be-built-in-mitchell-county-georgia","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/the-largest-bifacial-solar-module-tracker-project-in-the-u-s-to-be-built-in-mitchell-county-georgia\/","title":{"rendered":"The largest bifacial solar module, tracker project in the U.S. to be built in Mitchell County, Georgia"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The largest bifacial+tracker power generation project in the United States will be built up in Mitchell County, Georgia, with a capacity of 224 MW, for which LONGi will supply bifacial PERC modules.&nbsp;The project, which is expected to be completed by the end of 2019, will provide adequate clean electricity to<a href=\"https:\/\/solarbuildermag.com\/projects\/the-largest-bifacial-solar-panel-tracker-project-in-the-u-s-to-be-built-in-mitchell-county-georgia\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14802,2906,9974,5863],"class_list":["post-485496","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-longi-solar","tag-news","tag-projects","tag-pv-modules"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/485496","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=485496"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/485496\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=485496"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=485496"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=485496"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}