{"id":485552,"date":"2019-02-25T15:33:23","date_gmt":"2019-02-25T15:33:23","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=23461"},"modified":"2019-02-25T15:33:23","modified_gmt":"2019-02-25T15:33:23","slug":"canadian-solar-wins-largest-public-sector-solar-procurement-bid-in-canada-this-year","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/canadian-solar-wins-largest-public-sector-solar-procurement-bid-in-canada-this-year\/","title":{"rendered":"Canadian Solar wins largest public sector solar procurement bid in Canada this year"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Canadian Solar Inc. won three solar power contracts with Alberta&rsquo;s Ministry of Infrastructure, for a total of 94 megawatts (MWp) of solar power system in southeast Alberta, with an average contracted PPA price of $48.05 (Canadian dollars) per megawatt-hour. When in operation, these solar plants will provide 55 percent of<a href=\"https:\/\/solarbuildermag.com\/news\/canadian-solar-wins-largest-public-sector-solar-procurement-bid-in-canada-this-year\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12961,2906,9974],"class_list":["post-485552","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-canadian-solar","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/485552","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=485552"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/485552\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=485552"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=485552"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=485552"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}