{"id":486833,"date":"2019-03-06T16:17:13","date_gmt":"2019-03-06T16:17:13","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=23604"},"modified":"2019-03-06T16:17:13","modified_gmt":"2019-03-06T16:17:13","slug":"hellermanntyton-releases-solar-wire-management-exclusively-for-first-solar-modules","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/hellermanntyton-releases-solar-wire-management-exclusively-for-first-solar-modules\/","title":{"rendered":"HellermannTyton releases solar wire management exclusively for First Solar modules"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>HellermannTyton just released the Series 6 RPC Hanger and Series 6 Fir Tree Fastener, specifically designed to fit the new Series 6 solar modules manufactured by First Solar. The parts&rsquo; purpose-driven design makes them the only fasteners offering a complete wire management solution. The Series 6 RPC Hanger can be<a href=\"https:\/\/solarbuildermag.com\/news\/hellermanntyton-releases-solar-wire-management-exclusively-for-first-solar-modules\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12495,2906,13601],"class_list":["post-486833","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-bos","tag-news","tag-wire-management"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/486833","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=486833"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/486833\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=486833"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=486833"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=486833"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}