{"id":487421,"date":"2019-03-11T12:34:37","date_gmt":"2019-03-11T12:34:37","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=23631"},"modified":"2019-03-11T12:34:37","modified_gmt":"2019-03-11T12:34:37","slug":"details-on-massachusetts-largest-community-solar-storage-farm-just-completed","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/details-on-massachusetts-largest-community-solar-storage-farm-just-completed\/","title":{"rendered":"Details on Massachusetts\u2019 largest community solar + storage farm (just completed)"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Massachusetts&rsquo; largest community solar + storage farm has completed construction and is nearing subscriber completion. The 7.1-MW Happy Hollow Community Solar + Storage Farm is built on a gravel pit in Winchendon, Mass., and includes a 3.3-MW energy storage system. The project is owned by SunRaise Investments, developed and constructed<a href=\"https:\/\/solarbuildermag.com\/energy-storage\/details-on-massachusetts-largest-solar-storage-farm-just-completed\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12984,14742,811,442,9974,14878],"class_list":["post-487421","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-borrego-solar","tag-cleanchoice-energy","tag-community-solar","tag-energy-storage","tag-projects","tag-solar-storage"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/487421","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=487421"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/487421\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=487421"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=487421"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=487421"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}