{"id":487451,"date":"2019-03-11T14:08:00","date_gmt":"2019-03-11T14:08:00","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=23637"},"modified":"2019-03-11T14:08:00","modified_gmt":"2019-03-11T14:08:00","slug":"microsoft-corp-signs-15-year-ppa-for-this-75-mw-solar-project-in-north-carolina","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/microsoft-corp-signs-15-year-ppa-for-this-75-mw-solar-project-in-north-carolina\/","title":{"rendered":"Microsoft Corp. signs 15-year PPA for this 75-MW solar project in North Carolina"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Microsoft Corp. and Invenergy are moving ahead with a 74-megawatt solar project in North Carolina, the Wilkinson Solar Energy Center, which will be constructed, owned and operated by Invenergy. Via the 15-year power purchase agreement, Microsoft will become the sole offtaker of the energy generated at the Wilkinson Solar Energy<a href=\"https:\/\/solarbuildermag.com\/news\/microsoft-corp-signs-15-year-ppa-for-this-75-mw-solar-project-in-north-carolina\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15081,2906,9974],"class_list":["post-487451","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-invenergy","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/487451","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=487451"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/487451\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=487451"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=487451"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=487451"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}