{"id":49053,"date":"2014-10-15T13:23:34","date_gmt":"2014-10-15T13:23:34","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=8248"},"modified":"2014-10-15T13:23:34","modified_gmt":"2014-10-15T13:23:34","slug":"canadian-solar-to-power-146-mw-of-projects-in-honduras","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/canadian-solar-to-power-146-mw-of-projects-in-honduras\/","title":{"rendered":"Canadian Solar to Power 146 MW of Projects in Honduras"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Canadian Solar Inc.&nbsp;one of the world&rsquo;s largest solar power companies, today announced that it executed a sales contract to supply photovoltaic (PV) modules to two utility scale projects totaling 146.4 MWp in Honduras. These two projects, entitled Project Developer\/EPC Solar Power S.A. de C.V. (SOPOSA) and Compan&iacute;a Hondurena de Energia<a href=\"http:\/\/solarbuildermag.com\/news\/canadian-solar-power-146-mw-projects-honduras\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12490,12487,2906,12497],"class_list":["post-49053","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-latin","tag-modules","tag-news","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/49053","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=49053"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/49053\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=49053"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=49053"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=49053"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}