{"id":492013,"date":"2019-04-09T13:00:51","date_gmt":"2019-04-09T13:00:51","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=23576"},"modified":"2019-04-09T13:00:51","modified_gmt":"2019-04-09T13:00:51","slug":"get-connected-best-practices-for-eliminating-pv-connector-failures","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/get-connected-best-practices-for-eliminating-pv-connector-failures\/","title":{"rendered":"Get Connected: Best practices for eliminating PV connector failures"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>PV connectors play a crucial role in the wiring of solar arrays. As designed and if correctly installed, they provide a high-voltage, high-current, low-resistance DC connection in a housing that is water-tight, temperature-resilient, UV and wire-pull-resistive over the 25-year-plus life of the solar installation. In addition, their snap- together connection<a href=\"https:\/\/solarbuildermag.com\/featured\/best-practices-for-eliminating-pv-connector-failures\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15092,12495,4737,2906,14026,15104,13601],"class_list":["post-492013","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-2019-march-april-print-issue","tag-bos","tag-featured","tag-news","tag-phoenix-contact","tag-pv-connectors","tag-wire-management"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/492013","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=492013"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/492013\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=492013"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=492013"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=492013"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}