{"id":493954,"date":"2019-04-23T12:01:50","date_gmt":"2019-04-23T12:01:50","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=23574"},"modified":"2019-04-23T12:01:50","modified_gmt":"2019-04-23T12:01:50","slug":"wire-you-doing-that-top-four-solar-installation-wire-management-issues","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/wire-you-doing-that-top-four-solar-installation-wire-management-issues\/","title":{"rendered":"Wire you doing that? Top four solar installation wire management issues"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>1. Cross-mating Cross-mating, which refers to the plugging of connectors from different manufacturers (between modules to optimizers\/microinverters, modules to field-connectors, optimizers to field connectors or field connectors to the BOS system) is one of the most common PV wiring mistakes. In fact, the EU-funded Solar Bankability Project&rsquo;s Failure Modes and<a href=\"https:\/\/solarbuildermag.com\/featured\/top-four-solar-installation-wire-management-issues\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15092,12495,13514,4737,14898,14134,13533,15108,14522,13601],"class_list":["post-493954","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-2019-march-april-print-issue","tag-bos","tag-ecolibrium-solar","tag-featured","tag-hellermanntyton","tag-heyco","tag-snake-tray","tag-staubli-electrical-connectors","tag-wiley","tag-wire-management"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/493954","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=493954"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/493954\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=493954"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=493954"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=493954"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}