{"id":498080,"date":"2019-05-22T14:02:52","date_gmt":"2019-05-22T14:02:52","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=24294"},"modified":"2019-05-22T14:02:52","modified_gmt":"2019-05-22T14:02:52","slug":"the-fronius-symo-advanced-inverter-is-the-first-to-achieve-sunspec-rapid-shutdown-certification","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/the-fronius-symo-advanced-inverter-is-the-first-to-achieve-sunspec-rapid-shutdown-certification\/","title":{"rendered":"The Fronius Symo Advanced inverter is the first to achieve SunSpec Rapid Shutdown Certification"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The Fronius Symo Advanced is the first inverter on the market to receive the official SunSpec Rapid Shutdown certification, according to the Indiana-based inverter manufacturer and the SunSpec Alliance. The three-phase inverter comes with an integrated Power Line Communication (PLC) transmitter based on the SunSpec Rapid Shutdown communication standard. What&rsquo;s<a href=\"https:\/\/solarbuildermag.com\/inverters\/the-fronius-symo-advanced-inverter-is-the-first-to-achieve-sunspec-rapid-shutdown-certification\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13215,12491,2906,14739],"class_list":["post-498080","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-fronius-usa","tag-inverters","tag-news","tag-sunspec-alliance"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/498080","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=498080"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/498080\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=498080"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=498080"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=498080"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}