{"id":498086,"date":"2019-05-22T13:37:19","date_gmt":"2019-05-22T13:37:19","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=24287"},"modified":"2019-05-22T13:37:19","modified_gmt":"2019-05-22T13:37:19","slug":"u-s-set-to-pass-south-korea-as-worlds-largest-grid-connected-battery-energy-storage-market-this-year","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/u-s-set-to-pass-south-korea-as-worlds-largest-grid-connected-battery-energy-storage-market-this-year\/","title":{"rendered":"U.S. set to pass South Korea as world\u2019s largest grid-connected battery energy-storage market this year"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The United States in 2019 will become the world&rsquo;s largest market for grid-connected battery energy storage as solar-plus-storage and peaking capacity requirements drive increased procurement, according to IHS Markit. Deployments of grid-connected energy storage in the United States this year are expected to amount to 712 MW. This represents a<a href=\"https:\/\/solarbuildermag.com\/news\/u-s-set-to-pass-south-korea-as-worlds-largest-grid-connected-battery-energy-storage-market-this-year\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[442,14752,2906],"class_list":["post-498086","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-energy-storage","tag-ihs-markit","tag-news"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/498086","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=498086"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/498086\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=498086"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=498086"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=498086"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}