{"id":502544,"date":"2019-06-24T17:15:54","date_gmt":"2019-06-24T17:15:54","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=24599"},"modified":"2019-06-24T17:15:54","modified_gmt":"2019-06-24T17:15:54","slug":"fyi-russelectrics-emergency-power-system-offers-redundant-plc-controls-manual-backup-capability","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/fyi-russelectrics-emergency-power-system-offers-redundant-plc-controls-manual-backup-capability\/","title":{"rendered":"FYI: Russelectric\u2019s Emergency Power System offers redundant PLC controls, manual backup capability"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Russelectric, a manufacturer of automatic transfer switches and power control systems, now offers an Emergency Power System that provides backup power during a utility power loss. The paralleling switchgear systems offer redundant programmable logic controller (PLC) controls and manual backup capability. Trusted by the largest critical facilities in the world,<a href=\"https:\/\/solarbuildermag.com\/bos\/fyi-russelectrics-emergency-power-system-offers-redundant-plc-controls-manual-backup-capability\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12495,7892,2906,3000,15006],"class_list":["post-502544","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-bos","tag-microgrids","tag-news","tag-products","tag-russelectric"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/502544","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=502544"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/502544\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=502544"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=502544"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=502544"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}