{"id":502686,"date":"2019-06-25T19:54:04","date_gmt":"2019-06-25T19:54:04","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=24605"},"modified":"2019-06-25T19:54:04","modified_gmt":"2019-06-25T19:54:04","slug":"nv-energy-reveals-plans-for-1-2-gw-of-new-solar-projects-it-is-building-in-southern-nevada","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/nv-energy-reveals-plans-for-1-2-gw-of-new-solar-projects-it-is-building-in-southern-nevada\/","title":{"rendered":"NV Energy reveals plans for 1.2 GW of new solar projects it is building in Southern Nevada"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>NV Energy continues to work toward its long-term goal of serving its customers with 100 percent renewable energy, announcing the addition of nearly 1,200 megawatts of new solar photovoltaic generation to be built in the state, along with 590 megawatts of battery storage. The renewable energy will come in the<a href=\"https:\/\/solarbuildermag.com\/news\/nv-energy-reveals-plans-for-1-2-gw-of-new-solar-projects-it-is-building-in-southern-nevada\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[442,2906,11392,9974,14140],"class_list":["post-502686","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-energy-storage","tag-news","tag-nv-energy","tag-projects","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/502686","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=502686"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/502686\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=502686"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=502686"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=502686"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}