{"id":504488,"date":"2019-07-08T15:12:30","date_gmt":"2019-07-08T15:12:30","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=24686"},"modified":"2019-07-08T15:12:30","modified_gmt":"2019-07-08T15:12:30","slug":"pine-gate-renewables-starts-construction-on-101-megawatt-solar-project-in-south-carolina","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/pine-gate-renewables-starts-construction-on-101-megawatt-solar-project-in-south-carolina\/","title":{"rendered":"Pine Gate Renewables starts construction on 101 megawatt solar project in South Carolina"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Construction of Bowman Solar has commenced, according to Pine Gate Renewables, a national utility-scale solar developer. Bowman is a 101-megawatt project spanning 651 acres in Orangeburg County, South Carolina, making it one of the largest solar sites in the state. Through the teamwork of Pine Gate&rsquo;s in-house EPC team and<a href=\"https:\/\/solarbuildermag.com\/news\/pine-gate-renewables-starts-construction-on-101-megawatt-solar-project-in-south-carolina\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,15152,9974,13172],"class_list":["post-504488","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-pine-gate-renewables","tag-projects","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/504488","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=504488"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/504488\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=504488"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=504488"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=504488"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}