{"id":505871,"date":"2019-07-16T13:41:43","date_gmt":"2019-07-16T13:41:43","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=24768"},"modified":"2019-07-16T13:41:43","modified_gmt":"2019-07-16T13:41:43","slug":"cypress-creek-renewables-endings-its-internal-epc-business-with-eye-toward-long-term-value-creation-in-solar","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/cypress-creek-renewables-endings-its-internal-epc-business-with-eye-toward-long-term-value-creation-in-solar\/","title":{"rendered":"Cypress Creek Renewables endings its internal EPC business with eye toward \u2018long-term value creation\u2019 in solar"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Cypress Creek Renewables is shifting to a third-party model for Engineering, Procurement and Construction (EPC), as part of its new Go-Forward strategy, and will be winding down its internal EPC division over the coming months. &ldquo;Internal EPC made sense when we were concentrated primarily on deploying solar in the Carolinas,<a href=\"https:\/\/solarbuildermag.com\/news\/cypress-creek-renewables-endings-its-internal-epc-business-with-eye-toward-long-term-value-creation-in-solar\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13835,2906],"class_list":["post-505871","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-cypress-creek-renewables","tag-news"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/505871","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=505871"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/505871\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=505871"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=505871"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=505871"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}