{"id":507021,"date":"2019-07-23T14:41:51","date_gmt":"2019-07-23T14:41:51","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=24817"},"modified":"2019-07-23T14:41:51","modified_gmt":"2019-07-23T14:41:51","slug":"swinerton-renewable-energy-solar-flexrack-building-a-26-mw-solar-plant-in-connecticut","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/swinerton-renewable-energy-solar-flexrack-building-a-26-mw-solar-plant-in-connecticut\/","title":{"rendered":"Swinerton Renewable Energy, Solar FlexRack building a 26-MW solar plant in Connecticut"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Solar FlexRack, a division of Northern States Metals and a leader in photovoltaic mounting and solar tracker solutions, has completed a contract to supply a 26.4 MWac solar power generation plant for Swinerton Renewable Energy (SRE), which will serve as the project&rsquo;s engineering, procurement and construction (EPC) firm. The Tobacco<a href=\"https:\/\/solarbuildermag.com\/news\/swinerton-renewable-energy-solar-flex-rack-building-solar-plant-in-connecticut\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12637,2906,9974,13220,13355],"class_list":["post-507021","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-mounting-guide","tag-news","tag-projects","tag-solar-flexrack","tag-swinerton-renewable-energy"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/507021","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=507021"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/507021\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=507021"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=507021"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=507021"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}