{"id":50770,"date":"2014-10-21T16:41:15","date_gmt":"2014-10-21T16:41:15","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=8369"},"modified":"2014-10-21T16:41:15","modified_gmt":"2014-10-21T16:41:15","slug":"standard-solar-completes-1-8-mw-array-in-new-mexico","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/standard-solar-completes-1-8-mw-array-in-new-mexico\/","title":{"rendered":"Standard Solar Completes 1.8-MW Array in New Mexico"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Standard Solar Inc., a leader in the full-service development, construction, integration, financing and installation of solar electric systems, continues to expand westward with the completion of another solar project in New Mexico. The 1.8-MW, ground-mounted solar array for the Mora-San Miguel Electric Cooperative, co-developed by Standard Solar and Ute Peak<a href=\"http:\/\/solarbuildermag.com\/news\/standard-solar-completes-1-8-mw-array-new-mexico\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12494,2906,12497,9674],"class_list":["post-50770","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ground","tag-news","tag-project","tag-southwest"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/50770","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=50770"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/50770\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=50770"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=50770"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=50770"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}