{"id":510855,"date":"2019-08-19T12:51:50","date_gmt":"2019-08-19T12:51:50","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=25019"},"modified":"2019-08-19T12:51:50","modified_gmt":"2019-08-19T12:51:50","slug":"how-this-roof-maxx-spray-can-extend-asphalt-roofing-life-ease-customer-fears","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/how-this-roof-maxx-spray-can-extend-asphalt-roofing-life-ease-customer-fears\/","title":{"rendered":"How this Roof Maxx spray can extend asphalt roofing life, ease customer fears"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The solar company&rsquo;s sales challenge has been homeowners&rsquo; reluctance to install solar panels over a roof that may fail in the years ahead, forcing them to pay the cost of removal and reinstallation, in addition to a roof repair. Roof Maxx provides the solution. Nate Anderson started the first Roof<a href=\"https:\/\/solarbuildermag.com\/news\/how-this-roof-maxx-spray-can-extend-asphalt-roofing-life-ease-customer-fears\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,3000,13095,15187],"class_list":["post-510855","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-products","tag-residential-solar","tag-roof-maxx"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/510855","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=510855"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/510855\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=510855"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=510855"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=510855"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}