{"id":511956,"date":"2019-08-26T16:30:14","date_gmt":"2019-08-26T16:30:14","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=25071"},"modified":"2019-08-26T16:30:14","modified_gmt":"2019-08-26T16:30:14","slug":"three-solar-projects-coming-soon-as-part-of-marylands-community-solar-pilot-program","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/three-solar-projects-coming-soon-as-part-of-marylands-community-solar-pilot-program\/","title":{"rendered":"Three solar projects coming soon as part of Maryland\u2019s community solar pilot program"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>&nbsp; TurningPoint Energy and ForeFront Power are beginning construction of three fully developed Maryland-based community solar projects. These projects, which represent 6.57 megawatts (DC) of community solar capacity, are expected to be completed by the end of 2019. These projects were awarded to and developed by TurningPoint Energy as part<a href=\"https:\/\/solarbuildermag.com\/news\/three-solar-projects-coming-soon-as-part-of-marylands-community-solar-pilot-program\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9974],"class_list":["post-511956","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/511956","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=511956"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/511956\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=511956"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=511956"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=511956"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}