{"id":512396,"date":"2019-08-28T17:28:03","date_gmt":"2019-08-28T17:28:03","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=25121"},"modified":"2019-08-28T17:28:03","modified_gmt":"2019-08-28T17:28:03","slug":"standard-solar-pivot-energy-are-co-developing-close-to-9-megawatts-of-community-solar-in-colorado","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/standard-solar-pivot-energy-are-co-developing-close-to-9-megawatts-of-community-solar-in-colorado\/","title":{"rendered":"Standard Solar, Pivot Energy are co-developing close to 9 megawatts of community solar in Colorado"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>National solar companies Pivot Energy and Standard Solar have expanded their partnership to co-develop five more community solar sites across Colorado. The portfolio of projects, all ground mount arrays, will total approximately 8.9 megawatts (MWs). The first two projects in the expanded portfolio will begin construction at the end of<a href=\"https:\/\/solarbuildermag.com\/news\/standard-solar-pivot-energy-developing-community-solar-in-colorado\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[811,2906,15199,9974,3103],"class_list":["post-512396","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-community-solar","tag-news","tag-pivot-energy","tag-projects","tag-standard-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/512396","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=512396"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/512396\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=512396"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=512396"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=512396"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}