{"id":512544,"date":"2019-08-29T18:49:31","date_gmt":"2019-08-29T18:49:31","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=25181"},"modified":"2019-08-29T18:49:31","modified_gmt":"2019-08-29T18:49:31","slug":"fortress-power-has-three-lithium-iron-phosphate-battery-sizes-to-check-out-at-spi-2019","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/fortress-power-has-three-lithium-iron-phosphate-battery-sizes-to-check-out-at-spi-2019\/","title":{"rendered":"Fortress Power has three Lithium Iron Phosphate battery sizes to check out at SPI 2019"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Booth 7335 Fortress Power is a lithium battery manufacturer based outside of Philadelphia that focuses on helping solar installers use the safest and most reliable energy storage for their projects. The company provides three different size models for energy storage projects &mdash; its LFP-5 kWh, LFP-10 kWh, and eVault 18.5<a href=\"https:\/\/solarbuildermag.com\/energy-storage\/fortress-power-has-three-lithium-iron-phosphate-battery-sizes-to-check-out-at-spi-2019\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[573,442,15203,2906,3000,15201],"class_list":["post-512544","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-batteries","tag-energy-storage","tag-fortress-power","tag-news","tag-products","tag-solar-power-international-previews-2019"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/512544","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=512544"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/512544\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=512544"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=512544"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=512544"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}