{"id":514461,"date":"2019-09-12T12:41:21","date_gmt":"2019-09-12T12:41:21","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=25395"},"modified":"2019-09-12T12:41:21","modified_gmt":"2019-09-12T12:41:21","slug":"with-snake-trays-solar-snake-max-theres-no-need-to-de-rate-cables","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/with-snake-trays-solar-snake-max-theres-no-need-to-de-rate-cables\/","title":{"rendered":"With Snake Tray\u2019s Solar Snake Max there\u2019s no need to de-rate cables"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>SPI 2019 Preview | Booth 4234 With Snake Tray, there&rsquo;s no need to de-rate cables. Solar Snake Max Cable Management for Utility Grade Installations maintains the proper cable separation required by NEC Article 310 electrical code and eliminates the need to de-rate cables which substantially saves on the cost of<a href=\"https:\/\/solarbuildermag.com\/bos\/with-snake-trays-solar-snake-max-theres-no-need-to-de-rate-cables\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12495,3000,13533,15201],"class_list":["post-514461","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-bos","tag-products","tag-snake-tray","tag-solar-power-international-previews-2019"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/514461","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=514461"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/514461\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=514461"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=514461"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=514461"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}