{"id":515135,"date":"2019-09-18T00:04:30","date_gmt":"2019-09-18T00:04:30","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=25485"},"modified":"2019-09-18T00:04:30","modified_gmt":"2019-09-18T00:04:30","slug":"nexamp-makes-its-move-into-energy-storage-with-these-six-new-projects","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/nexamp-makes-its-move-into-energy-storage-with-these-six-new-projects\/","title":{"rendered":"Nexamp makes its move into energy storage with these six new projects"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Responding to the increasing demand and need for state-of-the-art Battery Energy Storage Systems (BESS), Nexamp is deploying its first energy storage projects, representing more than 51 MWh of capacity. These first half dozen projects are located across sites in New York and Massachusetts taking advantage of economic incentives available under<a href=\"https:\/\/solarbuildermag.com\/projects\/nexamp-makes-its-move-into-energy-storage-with-these-six-new-projects\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,13096,9974],"class_list":["post-515135","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-nexamp","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/515135","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=515135"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/515135\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=515135"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=515135"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=515135"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}