{"id":517939,"date":"2019-10-02T18:47:30","date_gmt":"2019-10-02T18:47:30","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=25627"},"modified":"2019-10-02T18:47:30","modified_gmt":"2019-10-02T18:47:30","slug":"details-on-a-portfolio-of-five-huge-solar-plants-1-7-gw-total-coming-to-california-texas-via-intersect-power-signal-energy","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/details-on-a-portfolio-of-five-huge-solar-plants-1-7-gw-total-coming-to-california-texas-via-intersect-power-signal-energy\/","title":{"rendered":"Details on a portfolio of five huge solar plants (1.7 GW total) coming to California, Texas via Intersect Power, Signal Energy"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Intersect&nbsp;Power, a utility-scale renewable energy developer, along with Chattanooga, Tenn.-based EPC Signal Energy, has five massive shovel-ready projects, located in California and Texas, ready to begin construction in 2020. Signal and Intersect have been working over the past 18 months to design this large portfolio of solar power plants that<a href=\"https:\/\/solarbuildermag.com\/projects\/details-on-a-portfolio-of-five-huge-solar-plants-coming-to-california-texas-via-intersect-power-signal-energy\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2189,15233,2906,13010,9974,14004],"class_list":["post-517939","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-first-solar","tag-intersect-power","tag-news","tag-nextracker","tag-projects","tag-signal-energy-construction"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/517939","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=517939"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/517939\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=517939"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=517939"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=517939"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}