{"id":519822,"date":"2019-10-15T12:00:39","date_gmt":"2019-10-15T12:00:39","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=25285"},"modified":"2019-10-15T12:00:39","modified_gmt":"2019-10-15T12:00:39","slug":"vertical-reach-trina-solar-is-taking-turn-key-solar-procurement-to-its-furthest-point-yet","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/vertical-reach-trina-solar-is-taking-turn-key-solar-procurement-to-its-furthest-point-yet\/","title":{"rendered":"Vertical Reach: Trina Solar is taking turn-key solar procurement to its furthest point yet"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Solar engineering, procurement and construction (EPC) companies have all too often been forced to choose solar components for projects as a function of what is available in a given timeframe rather than what is preferred. While cost may not be a great issue in these cases, making all the parts<a href=\"https:\/\/solarbuildermag.com\/featured\/vertical-reach-trina-solar-is-taking-turn-key-solar-procurement-to-its-furthest-point-yet\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[4737,2906,3000,5863,15223,13050,1635],"class_list":["post-519822","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-featured","tag-news","tag-products","tag-pv-modules","tag-september-october-2019-print-issue","tag-solar-trackers","tag-trina-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/519822","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=519822"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/519822\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=519822"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=519822"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=519822"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}