{"id":521646,"date":"2019-10-28T17:20:57","date_gmt":"2019-10-28T17:20:57","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=25830"},"modified":"2019-10-28T17:20:57","modified_gmt":"2019-10-28T17:20:57","slug":"long-duration-energy-storage-provider-ess-nets-30-million-to-expand-iron-flow-battery-manufacturing","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/long-duration-energy-storage-provider-ess-nets-30-million-to-expand-iron-flow-battery-manufacturing\/","title":{"rendered":"Long-duration energy storage provider ESS nets $30 million to expand iron flow battery manufacturing"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>ESS Inc., a manufacturer of long-duration energy storage systems, has secured $30 million in a Series C investment round led by Breakthrough Energy Ventures and SoftBank Group&rsquo;s SB Energy.&nbsp;The new funding will be used to expand and automate the manufacturing process of ESS Inc.&rsquo;s second-generation iron flow battery technology. The<a href=\"https:\/\/solarbuildermag.com\/batteries\/long-duration-energy-storage-provider-ess-nets-30-million-to-expand-iron-flow-battery-manufacturing\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[573,442,15252,13272,2906],"class_list":["post-521646","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-batteries","tag-energy-storage","tag-ess","tag-investment","tag-news"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/521646","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=521646"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/521646\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=521646"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=521646"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=521646"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}