{"id":522741,"date":"2019-11-05T14:00:41","date_gmt":"2019-11-05T14:00:41","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=25889"},"modified":"2019-11-05T14:00:41","modified_gmt":"2019-11-05T14:00:41","slug":"origis-energy-tabs-res-to-build-57-mw-solar-project-in-mitchell-county-georgia","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/origis-energy-tabs-res-to-build-57-mw-solar-project-in-mitchell-county-georgia\/","title":{"rendered":"Origis Energy tabs RES to build 57-MW solar project in Mitchell County, Georgia"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Origis Energy USA selected RES to construct the Origis Energy Tanglewood Solar project, a 57.5 MW(ac) solar farm in Mitchell County, Georgia. Origis Energy developed the solar site as one of the facilities under the Georgia Power Renewable Energy Development Initiative (REDI) serving the utility&rsquo;s customers participating in the Commercial<a href=\"https:\/\/solarbuildermag.com\/projects\/origis-energy-tabs-res-to-build-57-mw-solar-project-in-mitchell-county-georgia\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,57,9666],"tags":[2906,13010,13996,9974,15263,13050],"class_list":["post-522741","post","type-post","status-publish","format-standard","hentry","category-georgia-leed-projects","category-leed-news","category-solar-power-energy","tag-news","tag-nextracker","tag-origis-energy","tag-projects","tag-res","tag-solar-trackers"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/522741","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=522741"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/522741\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=522741"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=522741"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=522741"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}