{"id":523061,"date":"2019-11-07T14:49:52","date_gmt":"2019-11-07T14:49:52","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=25913"},"modified":"2019-11-07T14:49:52","modified_gmt":"2019-11-07T14:49:52","slug":"filtrine-manufacturing-expands-solar-system-from-2013-to-cover-full-electricity-needs","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/filtrine-manufacturing-expands-solar-system-from-2013-to-cover-full-electricity-needs\/","title":{"rendered":"Filtrine Manufacturing expands solar system from 2013 to cover full electricity needs"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>With the recent expansion of its solar array, Filtrine Manufacturing Company now powers its entire operation with solar energy. The 793.1-kilowatt rooftop array installed this fall includes 2,234 solar panels and generates over 900 megawatt hours of solar electricity per year. The system was installed by ReVision Energy. A 30-kilowatt<a href=\"https:\/\/solarbuildermag.com\/news\/filtrine-manufacturing-expands-solar-system-from-2013-to-cover-full-electricity-needs\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13203,2906,9974,14409],"class_list":["post-523061","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial","tag-news","tag-projects","tag-revision-energy"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/523061","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=523061"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/523061\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=523061"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=523061"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=523061"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}