{"id":523250,"date":"2019-11-08T17:13:05","date_gmt":"2019-11-08T17:13:05","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=25952"},"modified":"2019-11-08T17:13:05","modified_gmt":"2019-11-08T17:13:05","slug":"greener-steel-shepard-steel-says-its-solar-system-is-exceeding-early-production-estimates","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/greener-steel-shepard-steel-says-its-solar-system-is-exceeding-early-production-estimates\/","title":{"rendered":"Greener steel? Shepard Steel says its solar system is exceeding early production estimates"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Shepard Steel, a structural steel and miscellaneous metals company serving the Greater Hartford region since 1956, says that a 611-kilowatt (kW) DC solar energy system installed on its headquarters went live on July 23, and has exceeded production estimates in the months since.&nbsp;In the first three months of operation, the<a href=\"https:\/\/solarbuildermag.com\/news\/shepard-steel-says-its-solar-system-is-exceeding-early-production-estimates\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13203,2906,9974,13360],"class_list":["post-523250","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial","tag-news","tag-projects","tag-solect-energy"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/523250","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=523250"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/523250\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=523250"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=523250"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=523250"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}