{"id":524625,"date":"2019-11-18T14:04:21","date_gmt":"2019-11-18T14:04:21","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=26091"},"modified":"2019-11-18T14:04:21","modified_gmt":"2019-11-18T14:04:21","slug":"nextenergy-capital-acquires-99-percent-of-a-recurrent-energy-solar-project-in-north-carolina","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/nextenergy-capital-acquires-99-percent-of-a-recurrent-energy-solar-project-in-north-carolina\/","title":{"rendered":"NextEnergy Capital acquires 99 percent of a Recurrent Energy solar project in North Carolina"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Canadian Solar Inc. and its wholly-owned subsidiary Recurrent Energy&nbsp;closed a sale of 99 percent of its Class B membership interest in a 102 MWp NC 102 solar photovoltaic project, located in Cabarrus County, N.C., to NextEnergy Capital. NextEnergy Capital indirectly acquired 99 percent of the interests through NextPower III, its<a href=\"https:\/\/solarbuildermag.com\/financing\/nextenergy-capital-acquires-99-percent-of-a-recurrent-energy-solar-project-in-north-carolina\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12961,1590,2906,15292,9974,12963],"class_list":["post-524625","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-canadian-solar","tag-financing","tag-news","tag-nextenergy-capital","tag-projects","tag-recurrent-energy"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/524625","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=524625"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/524625\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=524625"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=524625"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=524625"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}