{"id":527108,"date":"2019-12-03T19:53:04","date_gmt":"2019-12-03T19:53:04","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=26206"},"modified":"2019-12-03T19:53:04","modified_gmt":"2019-12-03T19:53:04","slug":"mcelroy-metal-adds-solar-system-with-roof-recover-at-its-third-manufacturing-plant","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/mcelroy-metal-adds-solar-system-with-roof-recover-at-its-third-manufacturing-plant\/","title":{"rendered":"McElroy Metal adds solar system with roof recover at its third manufacturing plant"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>After completing successful solar panel installations with roof recovers at plants in Peachtree City, Ga., and Adelanto, Calif., McElroy Metal recently completed a third solar conversion with its plant in Clinton, Ill. Inovateus Solar installed 1,116 Hanwha Q-Plus L-G42 350W panels on the facility in Clinton. The system is rated<a href=\"https:\/\/solarbuildermag.com\/news\/mcelroy-metal-adds-solar-system-with-roof-recover-at-its-third-manufacturing-plant\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[9607,12637,2906,9974,13218,15188],"class_list":["post-527108","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-inovateus-solar","tag-mounting-guide","tag-news","tag-projects","tag-s-5","tag-standing-seam"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/527108","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=527108"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/527108\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=527108"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=527108"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=527108"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}