{"id":529254,"date":"2019-12-16T20:09:46","date_gmt":"2019-12-16T20:09:46","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=26327"},"modified":"2019-12-16T20:09:46","modified_gmt":"2019-12-16T20:09:46","slug":"atlas-renewable-energy-places-bifacial-module-order-with-chint-solar-astronergy","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/atlas-renewable-energy-places-bifacial-module-order-with-chint-solar-astronergy\/","title":{"rendered":"Atlas Renewable Energy places bifacial module order with Chint Solar, Astronergy"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>CHINT Solar\/Astronergy signed a new contract with Latam&rsquo;s solar energy giant, Atlas Renewable Energy, to supply 122 MW of bifacial modules to one of their projects in Chile by 2020. The increasing energy demand in Latin America, mainly in highly industrialized countries such as Chile, the profitability that solar energy<a href=\"https:\/\/solarbuildermag.com\/news\/atlas-renewable-energy-places-bifacial-module-order-with-chint-solar-astronergy\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15311,14765,14285,2906,3000,5863],"class_list":["post-529254","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-astronergy","tag-bifacial","tag-chint-power-systems","tag-news","tag-products","tag-pv-modules"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/529254","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=529254"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/529254\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=529254"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=529254"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=529254"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}