{"id":529868,"date":"2019-12-20T19:16:35","date_gmt":"2019-12-20T19:16:35","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=26389"},"modified":"2019-12-20T19:16:35","modified_gmt":"2019-12-20T19:16:35","slug":"facebooks-first-solar-farm-in-georgia-is-commissioned","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/facebooks-first-solar-farm-in-georgia-is-commissioned\/","title":{"rendered":"Facebook\u2019s first solar farm in Georgia is commissioned"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Facebook&rsquo;s first solar project in the state of Georgia, the Bancroft Station Solar Farm, was officially commissioned of on December 12. Module provider Q CELLS joined Facebook, Walton Electric Membership Corporation (EMC), Silicon Ranch, and state and local representatives to &ldquo;flip the switch&rdquo; on the 102.5 megawatt (MWAC) solar facility<a href=\"https:\/\/solarbuildermag.com\/news\/facebooks-first-solar-farm-in-georgia-is-commissioned\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9974,3342],"class_list":["post-529868","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-projects","tag-q-cells"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/529868","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=529868"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/529868\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=529868"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=529868"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=529868"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}