{"id":53151,"date":"2014-10-29T19:29:58","date_gmt":"2014-10-29T19:29:58","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=8418"},"modified":"2014-10-29T19:29:58","modified_gmt":"2014-10-29T19:29:58","slug":"certainteed-offers-solar-modulemounting-dual-system","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/certainteed-offers-solar-modulemounting-dual-system\/","title":{"rendered":"CertainTeed Offers Solar Module\/Mounting Dual system"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>With a powerful wattage upgrade to its Apollo II solar roofing system, CertainTeed Corporation solidifies a commitment to bringing the latest in alternative energy to its contractor and builder partners. Now featuring 60-watt monocrystalline integrated photovoltaic (PV) panels, Apollo II combines greater efficiency and unmatched aesthetics with its trademark easy<a href=\"http:\/\/solarbuildermag.com\/news\/certainteed-offers-solar-modulemounting-dual-system\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12845,12487,12496,2906],"class_list":["post-53151","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-bipv","tag-modules","tag-mounting","tag-news"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/53151","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=53151"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/53151\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=53151"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=53151"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=53151"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}