{"id":53192,"date":"2014-10-29T20:42:27","date_gmt":"2014-10-29T20:42:27","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=8421"},"modified":"2014-10-29T20:42:27","modified_gmt":"2014-10-29T20:42:27","slug":"hertz-to-install-solar-arrays-at-four-u-s-airports","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/hertz-to-install-solar-arrays-at-four-u-s-airports\/","title":{"rendered":"Hertz to Install Solar Arrays at Four U.S. Airports"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Hertz, the world&rsquo;s largest airport car rental brand, and Panasonic Enterprise Solutions Company (Panasonic) announce the completion of two solar power installations at Hertz Rent-a-Car facilities at Denver International and St. Louis International Airports. Additionally, solar installations are underway at Hertz&rsquo;s Newark Liberty International Airport, to be completed later this<a href=\"http:\/\/solarbuildermag.com\/news\/hertz-install-solar-arrays-four-u-s-airports\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[9679,2906,9726,9974,10045],"class_list":["post-53192","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-midwest","tag-news","tag-northeast","tag-projects","tag-west"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/53192","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=53192"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/53192\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=53192"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=53192"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=53192"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}