{"id":532116,"date":"2020-01-07T18:07:07","date_gmt":"2020-01-07T18:07:07","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=26484"},"modified":"2020-01-07T18:07:07","modified_gmt":"2020-01-07T18:07:07","slug":"rwes-west-of-pecos-texas-solar-project-is-now-online","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/rwes-west-of-pecos-texas-solar-project-is-now-online\/","title":{"rendered":"RWE\u2019s West of Pecos Texas solar project is now online"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>RWE announced it has achieved commercial operation on its West of the Pecos solar project, located in Reeves County, Texas, approximately 75 miles southwest of Midland-Odessa. West of the Pecos is a 100 megawatt (MWac) solar plant located on more than 700 acres leased from Texas Pacific Land Trust and<a href=\"https:\/\/solarbuildermag.com\/news\/rwes-west-of-pecos-texas-solar-project-is-now-online\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666,81],"tags":[13072,13425,12918,2906,13057,9974,15317,13050,14140],"class_list":["post-532116","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","category-texas-leed-projects","tag-array-technologies","tag-blattner-energy","tag-ja-solar","tag-news","tag-power-electronics","tag-projects","tag-rwe","tag-solar-trackers","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/532116","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=532116"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/532116\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=532116"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=532116"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=532116"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}