{"id":534303,"date":"2020-01-20T17:15:58","date_gmt":"2020-01-20T17:15:58","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=26735"},"modified":"2020-01-20T17:15:58","modified_gmt":"2020-01-20T17:15:58","slug":"pine-gate-renewables-to-build-13-mid-size-solar-farms-in-this-south-carolina-county","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/pine-gate-renewables-to-build-13-mid-size-solar-farms-in-this-south-carolina-county\/","title":{"rendered":"Pine Gate Renewables to build 13 mid-size solar farms in this South Carolina county"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Pine Gate Renewables, a national utility-scale solar developer, is bringing 13 mid-size solar farm projects to Greenwood County, S.C. The combined capacity from these sites totals 25.5 megawatts (MW), enough energy to power roughly 4,845 homes annually. These projects will add to Pine Gate&rsquo;s existing 16 projects in the state.<a href=\"https:\/\/solarbuildermag.com\/news\/pine-gate-renewables-to-build-13-mid-size-solar-farms-in-this-south-carolina-county\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666,33],"tags":[13832,2906,15152,9974,14140],"class_list":["post-534303","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","category-south-carolina-leed-points","tag-developer","tag-news","tag-pine-gate-renewables","tag-projects","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/534303","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=534303"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/534303\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=534303"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=534303"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=534303"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}