{"id":534629,"date":"2020-01-22T15:05:34","date_gmt":"2020-01-22T15:05:34","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=26767"},"modified":"2020-01-22T15:05:34","modified_gmt":"2020-01-22T15:05:34","slug":"capital-dynamics-8minute-solar-energy-hit-record-low-cost-on-eland-solar-storage-center","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/capital-dynamics-8minute-solar-energy-hit-record-low-cost-on-eland-solar-storage-center\/","title":{"rendered":"Capital Dynamics, 8minute Solar Energy hit record low cost on Eland Solar &amp; Storage Center"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Capital Dynamics&rsquo; Clean Energy Infrastructure (CEI) business signed a development partnership with 8minute Solar Energy for the equity financing and acquisition of the Eland Solar &amp; Storage Center &mdash; a 400 MWac solar and storage center project in Kern County, California. The project features a 300MW\/1200 MWh energy storage facility,<a href=\"https:\/\/solarbuildermag.com\/financing\/capital-dynamics-8minute-solar-energy-hit-record-low-cost-on-eland-solar-storage-center\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15253,15195,1590,2906,9974,14140],"class_list":["post-534629","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-8minute-solar-energy","tag-capital-dynamics","tag-financing","tag-news","tag-projects","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/534629","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=534629"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/534629\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=534629"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=534629"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=534629"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}